LinkedIn

Facebook

Instagram

  • Notre entreprise
  • Nos projets
  • Carrières
  • Actualités et informations

Night Work in Action: A Closer Look at the U.S. 50 Project in Sacramento

Personnel et carrières

Nord-Ouest

Californie du Nord

June 25, 2024

The U.S. 50 Multimodal Corridor Enhancement and Rehabilitation project is a beehive of activity, even when the sun sets. Take a behind-the-scenes look at the tireless efforts of Flatiron’s night shift crew to enhance this vital transportation corridor.

Safety is paramount to all Flatiron projects. U.S. 50 Health & Safety Specialist Adelia Bartelme emphasizes the importance of driver awareness. “These people put themselves on the line, every night. Be safe and smart out there.”

The US 50 multimodal project is a significant investment in Sacramento’s infrastructure, aiming to improve traffic flow, reduce congestion, and enhance safety for all road users.
 

Nouvelles en vedette

Loading...

FlatironDragados est le partenaire le plus fiable dans le développement d’infrastructures résilientes, durables et novatrices dans aux États-Unis et au Canada.
FlatironDragados
  • Projets
    • Actualités
      À propos de nous
      • À propos de FlatironDragados
        • Nos valeurs
          Rejoignez-nous
          • La vie chez FlatironDragados
            • Joignez-vous à notre équipe
              droit d'auteur © 2025 FlatironDragados 
              • Éthique et conformité
              • política de privacidad
              • Conditions d'utilisation